First, the general procedure of power transmission operation: Second, the general procedure for power outage operations: Third, the two incoming lines switch positions. Fourth, the mother cabinet input procedures: 5. High-voltage backup circuit, input procedures and related equipment: The rest of the load is input according to the actual current, but the safety current of the equipment (1155A) must be paid attention to. The corresponding explanation should be made for the uninput circuit, and the main communication should be switched after the call. 1800 puffs disposable vape pen are so convenient, portable, and small volume, you just need to take them
We are China's leading manufacturer and supplier of disposable vape puff bars, 1800 puff disposable vape,disposable
vape 1800 puffs,vape pen 1800 puffs, 1800 puffs vape grape ice,e-cigarette 1800 puffs, and e-cigarette kit, and we
specialize in Disposable Vapes, e-cigarette vape pens, e-cigarette kits, etc.
1800 puff disposable vape,disposable vape 1800 puffs,vape pen 1800 puffs,1800 puffs vape grape ice,e-cigarette 1800 puffs Ningbo Autrends International Trade Co.,Ltd. , https://www.ecigarettevapepods.com
1. Check that all temporary safety measures and grounding wires installed on the equipment have been safely removed.
2. Check the relevant signals and indicators and the meter is correct.
3. Check that the circuit breaker is in the opening position and the handcart is in the test position.
4. The handlebar is shaken to the running position and the energy storage is normal.
5. Close the circuit breaker. After the power is turned on, the load switch and voltage should be normal.
1. Check if the electric meter indicates whether the brake is allowed to be pulled.
2. Disconnect the circuit breaker and check that the circuit breaker is in the off position.
3. The handcart is shaken to the test position.
4. Remove the control insurance.
1. Only one incoming line can run, and the other incoming line car is placed in the test position, and the aviation plug must be plugged in.
2. When the running line is powered off, the other incoming line can be closed.
3, high pressure prohibits manual closing, because the two incoming lines only have electrical locking, no mechanical locking.
4. When the power supply is normal, the P, T and secondary power insurance of the other incoming line should be taken off.
1. The mother cabinet is in the test position, the circuit breaker is in the opening position, and the hand truck is in the test position.
2. The signal of the mother cabinet is correct and the meter is correct.
3. Only one incoming line runs, first shake the handcart and then run the position.
4. Shake the busbar to the running position and the electric energy storage is correct.
5. Close the busbar breaker.
6. Check whether the load and voltage indication are normal. If the abnormality needs to be checked, it can be operated after normal operation.
1. The main supply circuit must be powered off.
2. Disconnect the main supply cabinet switch according to the operation procedure, and at the same time supply the main cabinet for input, and the No. 1 transformer cabinet is disconnected.
3. According to the operation sequence, the switch and the No. 2 transformer cabinet switch are prepared.
4. Disconnect the low-voltage cabinets of No.1 and No.2, and connect the No.2 low-voltage main cabinet. Shake the liaison cabinet to the working position, close the No.1 low-voltage main cabinet, and then close the shunt switches respectively. The circuits to be input are:
(1), residents switch (1-7, Duanjiatan), South Fourth Floor.
(2), apartment part (Apartment No. 1-5).
(3), office building, student canteen.