Description of Fidget Sleeve Toys for Reducing Stress
Fidget sleeve toys give the hands something to do so the mind can relax and focus on the task. Squeeze or slide the marble back and forth, or squeeze the sleeve together to roll the marble around. Silent and strong they are enjoyable and easy to use. QUALITY Made with high-quality, BPA-free plastic and premium marbles (meeting all toy safety standards), These fidget toys are durable and safe for kids and adults alike. Fidget toys are great for all children and adults, but especially those with ADD/ADHD, OCD, autism, or high stress / anxiety levels.
Features of Fidget Sleeve Toys for Reducing Stress
1. Light weight & Flexible & Insulation & UV Resistant & Decoration & Flame-retardant & Durable abrasion resistance & Resistant to chemical degradation, in a wide range of industrial applications.
Fidget Toy Sleeve,Reduce Stress Sleeve Toy ,Stress Relief Sleeve Toy,Sleeve For Fidget Toys Shenzhen Huiyunhai Tech.Co.,Ltd , https://www.hyhbraidedsleeve.com
During the “Eleventh Five-Year Plan†period, the development of Taiyuan’s power grid was unprecedented, with a total investment of 4.688 billion yuan. A 500-kilovolt transformer substation, five 220-kilovolt transformer substations were built, and 17 110-kilovolt power transmission and transformation projects were completed. At present, a network structure consisting mainly of 500 kilovolt ring networks, 220 kilovolt double ring networks and 110 kilovolt radiation networks has been formed in the Taiyuan area.
During the "Twelfth Five-Year Plan" period, Taiyuan Power Grid will, on the basis of a 500-kilovolt ring network, push the 500-kilovolt transformer substation into the urban load center; the 220-kilovolt power grid will aim to meet regional electricity demand and strengthen grids, forming a goal. "Move" shaped grid structure; 110 kV grid will continue to build to meet the "N-1" criteria (power system components in any independent components automatically removed after the failure, does not cause other lines to trip, resulting in user power outage) Electricity network, key areas to meet the "N-2" criteria. It is understood that during the 12th Five-Year Plan period, Taiyuan Power Grid will build a new 500 kV substation, 8 220 kV substations, and 25 110 kV substations, and the substation 110 kV and above will increase 8.14 million kVA. .
2. Braided of 0.25mm / 0.2mm Pet monofilament.
3. The open weave construction allows an easy installation on a bundle of hoses and cables, even if some with bulky or large connectors.
National Grid Taiyuan Power Grid Investment in the "Twelfth Five-year Plan" will reach 8.5 billion yuan
During the “Twelfth Five-Year Plan†period, Shanxi Taiyuan Power Supply Branch will invest 8.492 billion yuan for the construction of power grids. The 500-kilovolt transformer substation will penetrate into the urban area, and the 220-kilovolt power grid will become the urban high-voltage distribution network. Recently, the author has learned that during the “12th Five-Year Plan†period, with the rapid economic development of Taiyuan City, the city’s power supply load and substation capacity will further increase.